Polish (Poland)English (United Kingdom)Deutsch (DE-CH-AT)
var so = new SWFObject("/templates/energoterm/flash/flash_header_intro.swf", "flash_header", "780", "174", "5", "#fef7ee"); so.addParam("wmode", "transparent"); so.write("flash_header"); '); } else { print(' '); } ?>
Selected projects PDF Print

Satisfaction of our Customers is the best visiting-card of Energoterm Sp. z o.o. – reliable and honest business partner.

Task financed from PHARE Programme:

Delivery and assembly of the main heat distribution pipeline, and geothermal forcing system in Poronin and in Zakopane
Investor: Przedsiębiorstwo Energetyki Cieplnej Geotermia Podhalańska S.A. in Zakopane.
Total value: 5 792 810,59 EUR


Task financed from SAPARD Programme:
Building sewing systems together with pumping stations, electric reinforcement and house drain pipes in Gwoździce, “turnkey” system
Investor: Municipality and Community of Krapkowice
Total value: 632 782,30 EUR


Task financed from SAPARD Programme:
Building sewing systems and rain sewage system, and sanitary sewage in Grzywna Centre – consigning collector Grzywna - Browina, “turnkey” system.
Investor: Community of Chełmża
Total value: 496 272,81 EUR


Task financed from SAPARD Programme:

Building sanitary sewage system with house drain pipes and pumping stations on Kuków Street in Krzepice, “turnkey” system.
Investor: Municipality and Community of Krzepice
Total value: 495 791,32 EUR


Task financed from PHARE Programme:
Building sanitary sewage and water supply system in Rozdroże Village, Community of Nidzica, “turnkey” system.
Investor: Community of Nidzica
Total value: 271 853,55 EUR


Task financed from SAPARD Programme:
Building sanitary sewage system, pressure and gravity with zonal pumping stations and house drain pipes in villages: Gołotczyzna, Sońsk, Gąsocin and Sobokleszcz.
Investor: Community of  Sońsk
Total value: 422 828,05 EUR


Task financed from SAPARD Programme:
Execution of boiler powered bio-mass (Power of 600kW) to reinforce buildings of Primary School and Gimnazjum in Białołęka
Investor: Community of Pęcław.
Total value: 269 616,61 EUR


Task financed from the World Bank credit:
Delivery and assembly of pre-insulated pipes  (Dn 600) - Magistrala Nowozachodnia, “turnkey” system.
Investor: Przedsiębiorstwo Energetyki Cieplnej Katowice S.A.
Total value: 4 128 685,10 EUR


Task financed from the World Bank credit:
District heating pipelines in Zakopane. Stage I, Contract no GB-IBRD-NCB-2/2000.
Investor: Przedsiębiorstwo Energetyki Cieplnej Geotermia Podhalańska S.A. w Zakopanem .
Total value: 772 886,23 EUR


Public order:

Building sanitary sewage system with sewage connection for family housing buildings in Kargoszyn, Ciechanów Community.
Investor: Community of Ciechanów
Total value: 219 956,87 EUR


Public order:

Replacement of an outdated underground double pipe Dn 500 in diameter, heating pipeline for pre-insulated heating network system made in Logstor Ror technology.
Investor: Przedsiębiorstwo Energetyki Cieplnej Toruń Sp. z o.o.
Total value: 1 679 226,70 EUR


Public order:

Liquidation of low emission dust and fumes boilers in a part of Grudziądz “turnkey” system – boiler liquidation, design and execution of heating pipeline to the military forces, design and execution of heat distribution centre in the military forces,  execution of the heat connection, execution of the heat distribution centre, heating pipeline visualization and heating distribution centre telemetry.
Investor: Okręgowe Przedsiębiorstwo Energetyki Cieplnej.
Grudziądz Sp. z o.o.
Total value: 1 454 078,81 EUR


Public order:

Execution of assembly and building works, liquidation of the local boilers and connecting customers to the municipial district heating network in the central and North part of Grudziądz in “turnkey” system. Execution of pre-insulated heating system, heat distribution centres and oil boilers. 
Investor: Okręgowe Przedsiębiorstwo Energetyki Cieplnej
Grudziądz Sp. z o.o.
Total value: 2 611 921,60 EUR


Public order:
Replacement of the coal fired boiler for gas-oil boiler with all distributing fittings and complementary infrastructure. This investment was co-financed by the Swiss Government.
Investor: Samodzielny Publiczny Zakład Opieki Zdrowotnej - Szpitala im.
dr Andrzeja Mielęckiego w Chorzowie.
Total value: 1 309 936,68 EUR


Task financed from SAPARD Programme:
Building sanitary sewage system with house drain pipes and pumping stations on Kuków Street in Krzepice, “turnkey” system.
Total value: 2.031.313,20 PLN

Task financed from SAPARD Programme:
Building sanitary sewage system with house drain pipes in Olszany village.
Total value: 3.466.626,79 PLN

Public order:
Building sanitary sewage system with sewage connection for family housing buildings in Kargoszyn, Ciechanów Community.
Total value: 886.261,72 PLN

Task financed from PHARE Programme:

Activating economic development of Szczeciniecki Area
•    Building sanitary sewage system and water supply system on Raciborki housing estate
•    Building sanitary, raining sewage systems and water supply system on Świątki housing estate
•    Sewage system in Przesieka and part of Parsęcko housing estate
Total value: 2.777.711,49 EUR
Building water supply main dn 500 with distributing systems on Olsztyńska Street from Czekoladowa to Ceramiczna
Total value: 1.543.486,00

Building sewage system for Wrzosy, Kaszczorek and Winnica districts in Toruń. Execution of building-assembly works on Goplany and Na Przełaj Streets.
Total value: 1.086.929,00 PLN

Public order:
Building sanitary sewage system from Chropaczów district, construction design preparation with a planning permission, building pressure and gravity sewage system with zonal pumping stations, complementary fittings and istalations.
Total value: 2.435.788,21 EUR